background image

6

Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]

OPERATION

RAISING A VEHICLE

1. Make sure that the vehicle is stable and is on firm level ground with the 

wheels chocked before positioning the jack directly below the lifting point. 
DO NOT rely upon the vehicle handbrake alone to prevent vehicle 
movement.

2. Make sure that the jack is on solid ground. If not, place a piece of solid 

wood of sufficient size to provide sufficient support below the jack.

3. Consult the vehicle owners manual to ascertain the location of the lifting 

points and position the jack below the designated lifting point.

4. Locate the slotted end of the jack handle on to the release valve and turn 

fully clockwise to close the valve.

5. Pump the handle and raise the ram so that the jack and lifting point are in 

full contact. Before proceeding further, make one last check to make sure 
that:

• the jack is vertical and stable.

• there are no obstructions to the lift and that the handle can move 

freely up and down.

• all personnel are in a safe position.

6. When satisfied, continue to pump the handle and lift the load to the height 

required.

7. Do not let anyone reach or work below the vehicle until it is firmly 

supported on suitable axle stands.

LOWERING THE VEHICLE

1. The lowering speed is controlled by the amount you turn the release valve. 

With the axle stands removed, check to make sure that there are no 

WARNING: MAKE SURE THAT THE SAFETY PRECAUTIONS ARE STRICTLY 
FOLLOWED. NO RESPONSIBILITY CAN BE ACCEPTED FOR INCORRECT USE 
OF THE JACK

WARNING: ALWAYS LOWER IN A SLOW AND CONTROLLED MANNER, AND 
CHECK THAT THERE ARE NO OBSTACLES IN THE PATH OF THE LOAD’S 
DESCENT. BE VERY CAREFUL WHEN LOWERING HEAVY LOADS.

Summary of Contents for strong-arm CBJ30

Page 1: ...OPERATION AND MAINTENANCE ORIGINAL INSTRUCTIONS GC0519 ISS 3 INSTRUCTIONS BOTTLE JACK MODEL NO CBJ30 PART NO 7620050...

Page 2: ...product is guaranteed against faulty manufacture for a period of 12 months from the date of purchase Please keep your receipt which will be required as proof of purchase This guarantee is invalid if...

Page 3: ...see the saddle and jacking point throughout the jacking operation in case there is any relative movement 12 Always make sure that the jack saddle is centred and stable on the lifting point before lift...

Page 4: ...ised at the same speed to reduce the possibility of the load slipping SAFETY SYMBOLS The following safety symbols may be found on the product Read the user manual before use LIFTING OPERATIONS AND LIF...

Page 5: ...an air pocket may have developed within the hydraulic ram and the ram action may therefore appear to be spongy In this case the jack may require purging as described on page 7 If the jack does not re...

Page 6: ...p the handle and raise the ram so that the jack and lifting point are in full contact Before proceeding further make one last check to make sure that the jack is vertical and stable there are no obstr...

Page 7: ...ually Check for cracks and deformation of components Check operation and top up the oil level see below Remove rust or corrosion and repaint to prevent corrosion Make sure that all decals and warning...

Page 8: ...trapped air 5 Turn the release valve counterclockwise one full turn and lower the ram to its lowest position Apply pressure if necessary 6 Turn the release valve clockwise to the closed position and...

Page 9: ...9 Parts Service 020 8988 7400 E mail Parts clarkeinternational com or Service clarkeinternational com PARTS DIAGRAMS...

Page 10: ...lug ZTGCBJ3009 10 Adjusting screw assembly ZTGCBJ3010 11 Spring ZTGCBJ3011 12 Spring holder ZTGCBJ3012 13 Steel ball 3mm ZTGCBJ3013 14 Base parts ZTGCBJ3014 15 Oil filter pipe ZTGCBJ3015 16 Cylinder r...

Page 11: ...11 Parts Service 020 8988 7400 E mail Parts clarkeinternational com or Service clarkeinternational com DECLARATION OF CONFORMITY...

Page 12: ......

Reviews: