GENERAL VIEW
SETUP AND OPERATION
1.
BEFORE STARTING WORK:
•
Before drilling into walls and floors etc., check first that there are no hidden
electrical cables, gas or water pipes etc.
•
Check the mains voltage before plugging in and switching on.
2.
FITTING AND CHANGING TOOLS:
•
Clean tools, and apply a thin film of grease before fitting.
•
Pull back the fastening sleeve and hold, push and rotate the dust free tool
into the tool holder as far as it will go, release the fastening sleeve, the tool
will then be locked in automatically.
•
Check the tool is locked in securely by attempting to pull the tool out.
3.
REMOVING TOOLS:
•
Ensure the drill has completely stopped and is disconnected from the
electrical supply.
•
Pull back the fastening sleeve and hold, pull the tool out of the tool holder
and store safely.
NOTE: for your protection, if the tool is hot, either allow it to cool down first or
use industrial gloves to remove the tool.
Fig. 2
1
2
4
5
6
7
8
9
10
11
3
1.
Dust Guard
2.
Fastening Sleeve
3.
Switch Trigger
4.
Handle Attachment
5.
Rear Cover
6.
Depth Stop
7.
Hammer Control
8.
Drill Control
9.
Lock Pin
10. Off-Lock Knob
11. Grease Cover
- 7 -
Summary of Contents for CRD1250
Page 11: ...PARTS DIAGRAM 10 ...
Page 14: ... 13 ...