HOW TO PREPARE THE MACHINE
FOR OPERATION
How To Install the Pads
WARNING: Always remove the electrical
plug from the electrical outlet
before installing or changing
the pad.
The pad driver assembly is on the bottom underside
of the machine. The pad holder holds the pad in
position. The machine has a screw-on pad holder.
To install the pad, follow this procedure:
1. Lock the handle in the verticle position.
2. Position the handle on the floor, so that the machine
is laying on its back. See Figure 2.
3. Unscrew the pad holder (A).
4. Carefully center the pad on the pad driver (B). Failure
to center may cause vibration and operator fatigue.
5. Screw the pad holder (A) into position.
6. Return the machine to an upright position.
Figure 2
↑
↑
A
B
Summary of Contents for 2000 DC
Page 14: ...EN ENGLISH Clarke Operator s Manual EN Ultra Speed Burnisher 13...
Page 26: ...Clarke Manual del operador ES Ultra Speed Burnisher 25 ES ESPA OL...
Page 38: ...Section II Parts and Service Manual 71280A Ultra Speed Burnisher 120V 240V with NEMA Plug...
Page 43: ...NOTES...
Page 44: ......