1) Excavate a 450mm deep x 640mm long x 320mm wide 

hole in the ground

NOTE: When installing in a hard surface or uneven & un-

level ground, a larger hole in the surface slab or pavers 

will be required in order to connect drainage pipes and 

water supply pipes and to be able to finish around the 

tray and blend in the unlevel ground to the edge of the 

tray.

2) When installing the footing cage and drainage tray, 

ensure that the top of drainage tray is level and flush with 

ground. If ground is unlevel ensure that at least one edge 

is flush with the ground and the other edges can be blend

-

ed in when finishing the surface to the edge of the tray.

NOTE: The footing cage & drainage tray must be in-

stalled level

3) To connect the water supply plumbing, feed pipe 

through the water access hole and extend 100mm above

ground level 

4) Connect a 90mm drainage plumbing to the 90mm 

Plumbqwik on each side of the tray.

5) Pour in 20mpa concrete mix into the drainage cage 

and finish concrete to desired level.

6) Ensure that the drainage tray is level and flush after 

plumbing connection and the pouring of the concrete.

7) Let concrete cure for 2 days before installing Drinking 

Station Unit

Install pipe protection around feed water pipe that is in contact with the concrete.

when installing on grass include a concrete edge 

or make good with concrete or pavers

Concrete footing 25mpa

Connect 90mm PVC drain pipe to Plumbqwik 

Connect to Stormwater or Soakage Pit