
GUS Vapor Control System™
M0015_F
6
G25-OER
Installation
CAUTION:
It will require two people to lift the system and install it on the wall.
1.
The G25-OER is 26.5” wide and will require at least an additional one inch clearance on
either side. There must be a minimum of 4” of clearance above the unit to allow for
adequate air circulation.
2.
Locate the center point of the OER-Pro on the wall behind the unit. Mark the wall at 67”
above the floor at the center point.
3.
Using a level draw a horizontal line 13.25” on each side of the center mark.
4.
Locate the bottom of the Z-bracket along the horizontal line. Mark the location of the six
holes on the Z-bracket against the wall.
5.
If the wall is of wood or metal stud construction, locate studs and drill new holes through
the Z-bracket to align with the center of the studs.
6.
Alternatively
, mount a piece of ¾” plywood cut to 38” high x 26.5” wide. Screw this directly
into the studs. The Z-bracket can then be screwed directly into the plywood.
7.
In the event that studs cannot be located use the EZ Anchors that are supplied and screw
into the wall at each mark.
NOTE
Mount the Z-bracket with open side upward
.
8.
Using the lifting straps lift the GUS system up and over the matching ‘Z’ bar on the wall. It is
a tight fit and you must make sure the two Z-brackets are securely interlocked before
releasing hold on the unit.
9.
The unit has two “L” brackets. One (upper “L” bracket) is attached to the lower section of
the blower housing. The second (lower “L” bracket) is attached to the side panels of the
G25-OER. Mark the location of the bracket holes for both upper and lower “L” brackets on
the wall. Either use EZ anchors supplied or screw directly into plywood. If using EZ anchors
see step 11.
10.
If wall is plaster or sheet rock, REMOVE the “L” brackets from the unit by removing the
mounting screws. This will allow you to install the EZ anchors at marks made in step 10.
11.
Install EZ anchors in the wall and re-attach “L” brackets to the unit with screws removed in
step 10.
12.
Using supplied screws attach unit to wall through “L” brackets into EZ anchors.
13.
Plug into a 110-volt wall outlet. The unit is now ready for use.
To review this or if you have any questions, please call CIVCO Medical Solutions at
1-800-445-6741