123
9
Practical information
Do not start the compressor before
connecting the white pipe to the tyre
valve: the sealant product would be
expelled through the pipe.
)
Switch on the compressor by moving
the switch
B
to position
"I"
until the tyre
pressure reaches 2.0 bars.
The sealant is injected into the tyre under
pressure; do not disconnect the pipe from
the valve during this operation (risk of
splashing).
)
Remove the kit and screw the cap back on
the white pipe.
Take care to avoid staining your vehicle
with traces of fluid. Keep the kit to hand.
)
Drive
immediately for approximately three
miles (five kilometres), at reduced speed
(between 15 and 35 mph (20 and 60 km/h)),
to plug the puncture.
)
Stop to check the repair and the tyre
pressure using the kit.
If after around 5 to 7 minutes the
pressure is not attained, this indicates
that the tyre is not repairable; contact
a CITROËN dealer or a qualified
workshop for assistance.
Summary of Contents for 2012 C-ELYSEE
Page 1: ......
Page 75: ...73 4 Fittings Boot fittings 1 Boot lamp 2 Storage box see details on a following page...
Page 160: ...158 Checks TOTAL CITRO N...
Page 174: ...172 Technical data Dimensions in mm...
Page 176: ...174 Technical data...
Page 233: ......
Page 234: ......
Page 236: ...CR ATIVE TECHNOLOGIE 2012 DOCUMENTATION DE BORD 4Dconcept Diadeis Edipro 12ELY 0040 Anglais...