Page 16
Gas Pipe Size Chart
TOTAL BTU/HR
(for LP Gas correct
total BTU/HR below by
multiplying by .6)
TOTAL
KCAL
HOUR
GAS PIPE SIZE FOR 1000 BTU (250 KCAL) NATURAL GAS
AT 7” W.C. (17.5 MBAR) PRESSURE
In figuring total length of pipe, make allowance for tees and elbows.
(150 ft.)
45,72 m
(125 ft.)
38,1 m
(100 ft.)
30,48 m
(75 ft.)
22,86 m
(50 ft.)
15,24 m
(25 ft.)
7,62 m
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000
1,400,000
1,500,000
1,600,000
1,700,000
1,800,000
1,900,000
2,000,000
2,200,000
2,400,000
2,600,000
2,800,000
3,000,000
3,200,000
3,400,000
3,600,000
3,800,000
4,000,000
15000
20000
25200
30200
35200
40300
45300
50400
75600
100800
126000
151200
176400
202000
230000
250000
270000
300000
330000
350000
380000
400000
430000
450000
480000
504000
550000
605000
650000
705000
750000
806000
850000
907000
960000
1000000
3/4
3/4
3/4
3/4
3/4
3/4
1
1
1
1 1/4
1 1/4
1 1/2
1 1/2
1 1/2
2
2
2
2
2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3/4
3/4
3/4
1
1
1
1
1
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3/4
3/4
1
1
1
1
1
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3/4
1
1
1
1
1 1/4
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
4
4
3/4
1
1
1
1
1 1/4
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
4
4
4
4
3/4
1
1
1
1 1/4
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
4
4
4
4
4
4
Summary of Contents for C125E
Page 10: ...Page 10 125 lb General Dimensions Illustration...
Page 11: ...Page 11 125 lb Steam Heated Dryer Dimensions Illustration...
Page 15: ...Page 15 Gas Loop Piping and Gas Supply Piping System Illustrations...
Page 19: ...Page 19 Steam Piping Installation Illustration...
Page 21: ...Page 21 Dryer Installation with Multiple Exhaust Illustration...
Page 28: ...Page 28 Two Timer Models Figures 1 2 and 3 Illustrations...
Page 31: ...Page 31 Moisture Control Illustration...
Page 38: ...Page 38 DIRECTSPARK IGNITIONOPERATION FLOW CHART...
Page 40: ...Page 40 Burner Air Inlet Adjustment with Illustration BURNERAIRINLET ADJUSTMENT...
Page 41: ...Page 41 Basket Alignment for 125 lb Dryers Illustrations...
Page 48: ...Page 48 125 lb Laundry Dryer Front Exploded View Illustration...
Page 50: ...Page 50 125 lb Dryer Double Motor Models Illustration...
Page 63: ...Page 63...