3-18
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 3 Cisco RFGW-10 UEQAM Installation
Attaching a Chassis Ground Connection
This completes the procedure for installing the chassis in a two-post rack. Proceed to
Chassis Ground Connection” section on page 3-18
to continue the installation.
Attaching a Chassis Ground Connection
Connecting the Cisco RFGW-10 chassis to earth ground is required for all DC powered installations
where compliance with NEBS grounding requirements is necessary.
The following are the tools, equipment, and supplies necessary to connect the system ground to the
chassis:
•
Phillips screwdriver
•
90 degree, 6 AWG wire, dual-lug chassis ground component (provided in the accessory kit)
•
6 AWG grounding wire
Have the recommended tools and supplies before you begin this procedure.
shows the Chassis NEBS grounding attached to the chassis in the lower left corner of the
rear of the chassis.
Figure 3-13
Installing the Cisco RFGW-10 UEQAM Telcordia Ground Connection
Warning
This equipment must be grounded. Never defeat the ground conductor or operate the equipment
in the absence of a suitably installed ground conductor. Contact the appropriate electrical
inspection authority or an electrician if you are uncertain that suitable grounding is available.
Statement 1024
1
Earth ground symbol
3
Earth ground AWG 6 wire lug
2
Chassis earth ground studs
4
Captive screws
273685
1
3
2
4