6-23
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 6 Cabling the Cisco RFGW-10 UEQAM
Cabling the Supervisor Engine
Figure 6-18
Installing the 10-Gigabit Ethernet X2 Transceiver
Note
10-Gigabit Ethernet X2 transceivers are keyed to prevent incorrect insertion.
Before removing the dust plugs and making any optical connections, observe the following guidelines:
•
Always keep the protective dust plugs on the unplugged fiber-optic cable connectors and the
transceiver optical bores until you are ready to make a connection.
•
Always inspect and clean the SC connector end-faces just before making any connections.
•
Always grasp the SC connector housing to plug or unplug a fiber-optic cable.
Step 5
Remove the dust plugs from the network interface cable SC connectors. Save the dust plugs for future
use.
Step 6
Inspect and clean the SC connector’s fiber-optic end-faces.
Tip
For complete information on inspecting and cleaning fiber-optic connections, refer to
Cleaning Procedures for Fiber-Optic Connections
Step 7
Remove the dust plugs from the 10-Gigabit Ethernet X2 transceiver optical bores.
Step 8
Immediately attach the network interface cable SC connectors to the 10-Gigabit Ethernet X2 transceiver.
120755
LINK
ACTIVE
1
LINK
ACTIVE
2
Port cover