Cisco 800M Series Integrated Services Router Hardware Installation Guide
Chapter 2 Installing the Router
Figure 2-7
Attaching the Brackets (I/O side facing the user - Offset rack mount)
Step 2
Mount the router into the rack using the screws provided in the rack.
Installing the Router Ground Connection
The router must be connected to a reliable earth ground. Install the ground wire in accordance with local
electrical safety standards.
•
For NEC-compliant grounding, use size 14 AWG (2 mm2) or larger copper wire and a ring terminal
with an inner diameter of 1/4 in. (5 to 7 mm).
•
For EN/IEC 60950-compliant grounding, use size 18 AWG (1 mm2) or larger copper wire.
Warning
This equipment needs to be grounded. Use a green and yellow 12 to 14 AWG ground wire to connect
the host to earth ground during normal use.
Statement 242
To install the ground connection, follow these steps:
Step 1
Strip one end of the ground wire to the length required for the terminal.
Step 2
Crimp the ground wire to the ring terminal using the wire crimper.
Step 3
If you choose to install the power switch lock, perform
. Otherwise, perform
,
and
Step 4
Attach the ring terminal to the chassis. Use the single screw provided. Tighten the screws to a torque of
8 to 10 inch-pound (0.9 to 1.1 newton meter) as shown in
.
Step 5
Install the power switch lock. Tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m). Torque the
hex standoff to the same torque.
Step 6
Connect the other end of the ground wire to a known reliable earth ground point at your site.
1
364414
1
Offset rack mount