
1-74
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
78-19286-01
Chapter 1 Install the Cisco ONS 15454 Shelf Assembly
Required Tools and Equipment (ETSI)
Step 4
Line up the first Y-cable module that you want to install with the desired slot, pull the latch at the bottom
of the Y-cable module to enable the Y-cable module to slide onto the guides, and slide the module down
until it is fully installed in the slot.
shows the Y-cable module that can be installed in the
Y-cable module tray.
Figure 1-31
Y-Cable Module
Step 5
Repeat Steps 1 through
as necessary for each Y-cable module you want to install.
Step 6
Return to your originating procedure (NTP).
NTP-G15 Install the Common Control Cards
Warning
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
touch the backplane with your hand or any metal tool, or you could shock yourself.
Statement 94
Purpose
This procedure describes how to install the common control cards.
Tools/Equipment
Redundant TCC2/TCC2P/TCC3 cards on Cisco ONS 15454 shelf
(required)
AIC-I card (optional)
MS-ISC-100T (optional; for multishelf node configurations)
Prerequisite Procedures
NTP-G7 Install the Power and Ground, page 1-33
NTP-G14 Install DWDM Equipment, page 1-66
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Provisioning or higher
151959
Tab
Summary of Contents for ONS 15454
Page 48: ...Tables xlviii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 ...
Page 58: ...Procedures lviii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 ...
Page 78: ...Tasks lxxviii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 ...
Page 85: ...lxxxv Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 Preface ...
Page 87: ...lxxxvii Cisco ONS 15454 DWDM Procedure Guide Release 9 2 78 19286 01 Preface ...