20-96
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A398 Automatically Route a Path Protection Circuit for a Topology Upgrade
Step 3
Choose one of the following:
•
Nodal Diversity Required
—Ensures that the primary and alternate paths within path protection
portions of the complete circuit path are nodally diverse.
•
Nodal Diversity Desired
—Specifies that node diversity is preferred, but if node diversity is not
possible, CTC creates fiber-diverse paths for the path protection portion of the complete circuit path.
•
Link Diversity Only
—Specifies that only fiber-diverse primary and alternate paths for path
protection portions of the complete circuit path are needed. The paths might be node-diverse, but
CTC does not check for node diversity.
Step 4
If you selected VT-DS3 Mapped Conversion in
, complete the following substeps; otherwise,
continue with
:
a.
Click
Next
.
b.
In the Conversion Circuit Route Constraints area, complete the following:
•
Node—Choose a node with a DS3XM-12 card installed.
•
Slot—Choose the slot where a DS3XM-12 card is installed.
•
DS3 Mapped STS—If applicable, choose
Circuit Dest
to indicate that the STS is the circuit
destination, or
Circuit Source
to indicate that the STS is the circuit source.
Step 5
If you selected Review Route Before Creation in
, complete the following substeps. If not,
continue with
.
a.
Click
Next
.
b.
Review the circuit route. To add or delete a circuit span, choose a node on the circuit route. Blue
arrows show the circuit route. Green arrows indicate spans that you can add. Click a span arrowhead,
then click
Include
to include the span or
Remove
to remove the span.
c.
If the provisioned circuit does not reflect the routing and configuration you want, click
Back
to
verify and change circuit information. If the circuit needs to be routed to a different path, see the
“NTP-A182 Create a Manually Routed DS-1 Circuit” procedure on page 6-11
Step 6
Click
Finish
.
Step 7
Return to your originating procedure (NTP).
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...