17-97
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 17 DLPs A1 to A99
DLP-A96 Provision a DS-1 or DS-3 Circuit Route
on the same network chooses the same port, STS, VT, or DS1as you simultaneously, one of you receives
a Path in Use error and is unable to complete the circuit. The user with the partial circuit needs to choose
new destination parameters.
Step 10
If you need to create a secondary destination, for example, a path protection bridge/selector circuit exit
point in a multivendor path protection, click
Use Secondary Destination
and repeat Steps
through
to define the secondary destination.
Step 11
Click
Next
.
Step 12
Return to your originating procedure (NTP).
DLP-A96 Provision a DS-1 or DS-3 Circuit Route
Step 1
In the Route Review/Edit area of the Circuit Creation wizard, click the source node icon if it is not
already selected.
Step 2
Starting with a span on the source node, click the arrow of the span you want the circuit to travel. The
arrow turns white. In the Selected Span area, the From and To fields provide span information. The
source STS and VT (DS-1 circuit only) appear.
Step 3
If you want to change the source STS, adjust the Source STS field; otherwise, continue with
.
Step 4
If you want to change the source VT for DS-1 circuits, adjust the Source VT field; otherwise, continue
with
Note
VT is gray (unavailable) for DS-3 circuits.
Step 5
Click
Add Span
. The span is added to the Included Spans list and the span arrow turns blue.
Step 6
If the Fully Protect Path check box is checked in the Circuit Routing Preferences area, you must:
•
Add two spans for all path protection or unprotected portions of the circuit route from the source to
the destination.
•
Add one span for all BLSR or 1+1 portions of route from the source to the destination.
•
For circuits routed on path protection DRI topologies, provision the working and protect paths as
well as spans between the DRI nodes.
Step 7
Repeat Steps
through
until the circuit is provisioned from the source to the destination node through
all intermediary nodes.
Purpose
This task provisions the circuit route for manually routed DS-1 or DS-3
circuits.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
The Circuit Creation wizard Route Review and Edit panel must be open.
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...