14-4
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 14 Add and Remove Nodes
NTP-A212 Add a BLSR Node
•
A CTC computer is directly connected to the new node.
•
CTC computers are directly connected to other nodes on the same subnet.
If these conditions are present, add static routes on the node that will be added to the BLSR, using the
following settings:
•
Destination IP address:
IP-address-of-the-CTC-computer-connected-to-the-new-node
•
Net Mask:
255.255.255.255
•
Next Hop:
IP-address-of-the-Cisco-ONS-15454
•
Cost:
1
See the
“DLP-A65 Create a Static Route” task on page 17-73
. To view Gateway Settings, see the
“DLP-A249 Provision IP Settings” task on page 19-30
.
Step 7
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at a node in the BLSR.
Step 8
Complete the
“DLP-A298 Check the Network for Alarms and Conditions” task on page 19-63
to verify
that the BLSR is free of major alarms or problems. If trouble is indicated (for example, a major alarm
exists), resolve the problem before proceeding. See
or, if necessary, refer
to the
Cisco ONS 15454 Troubleshooting Guide
.
Step 9
From the View menu, choose
Go to Network View
and click the
Provisioning > BLSR
tabs.
Step 10
On paper, record the Ring Name, Ring Type, Line Rate, Ring Reversion, and Span Reversion (4 Fiber).
Step 11
From the Nodes column, record the Node IDs in the BLSR. The Node IDs are the numbers in parentheses
next to the node name.
Step 12
Log into the new node:
•
If the node has a LAN connection and appears on the network map, from the View menu, choose
Go to Other Node
, then enter the new node.
•
If the new node is not connected to the network, log into it using the
.
Step 13
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-A227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If alarms appear, investigate and resolve
them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
for procedures.
Step 14
Using the information recorded in Steps
and the diagram created in
, create a BLSR on
the new node. See the
“DLP-A242 Create a BLSR on a Single Node” task on page 19-23
Step 15
(Optional.) Create test circuits, making sure they pass through the BLSR trunk cards and run test traffic
through the node to ensure the cards are functioning properly. See the
Routed OC-N Circuit” procedure on page 6-43
and the
“NTP-A62 Test OC-N Circuits” procedure on
for information.
Step 16
Create the data communications channel (DCC) terminations on the new node. See the
Provision Section DCC Terminations” task on page 20-61
Note
Creating the DCC terminations causes the SDCC Termination Failure and Loss of Signal alarms
to appear. These alarms remains active until you connect the node to the BLSR.
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...