5-6
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 5 Turn Up Network
NTP-A38 Provision a Linear ADM Network
Step 11
Verify that the test set has a clean signal. If a clean signal is not present, repeat Steps
through
make sure the test set and cabling are configured correctly.
Step 12
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
again, refer to the next level of support.
Step 13
Inject BIT errors from the test set. Verify that the errors appear at the test set, indicating a complete
end-to-end circuit.
Step 14
Complete the
“DLP-A356 TCC2/TCC2P Card Active/Standby Switch Test” task on page 20-40
Step 15
Complete the
“DLP-A255 Cross-Connect Card Side Switch Test” task on page 19-37
.
Step 16
Complete the
“DLP-A88 Optical 1+1 Protection Test” task on page 17-85
.
Step 17
Set up and complete a bit error rate (BER) test. Use the existing configuration and follow your site
requirements for the specified length of time. Record the test results and configuration.
Step 18
Remove any loopbacks, switches, or test sets from the nodes after all testing is complete.
Step 19
From the View menu, choose
Go to Network View
.
Step 20
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-A227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
if necessary.
c.
Complete the
“DLP-A516 Export CTC Data” task on page 22-6
to export the alarms information.
Step 21
Repeat Steps
through
for the other point-to-point node.
Step 22
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
again, refer to the next level of support.
Step 23
Delete the test circuit. See the
“DLP-A333 Delete Circuits” task on page 20-21
.
After all tests are successfully completed and no alarms exist in the network, the network is ready for
service application.
Stop. You have completed this procedure.
NTP-A38 Provision a Linear ADM Network
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at an ONS 15454 where you want to
provision in a linear ADM network. If you are already logged in, continue with Step 2.
Purpose
This procedure provisions three or more ONS 15454s in a linear add-drop
multiplexer (ADM) configuration.
Tools/Equipment
None
Prerequisite Procedures
NTP-A35 Verify Node Turn-Up, page 5-2
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
Provisioning and higher
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...