6-82
Cisco ONS 15454 SDH Procedure Guide, R7.0
78-17194-01
Chapter 6 Create Circuits and Low-Order Tunnels
NTP- D144 Create an E-Series Single-Card EtherSwitch Manual Cross-Connect
•
VLAN names
•
ONS 15454 SDH circuit nodes
If the circuit information is not correct, click the
Back
button and repeat the procedure with the correct
information. If the information is correct, check
Route Automatically
.
Note
You can also click
Finish
, delete the completed circuit, and start the procedure from the
beginning.
Step 21
Click
Finish
.
Step 22
Complete the
“DLP-D220 Provision E-Series Ethernet Ports” task on page 19-18
.
Step 23
Complete the
“DLP-D221 Provision E-Series Ethernet Ports for VLAN Membership” task on
.
Step 24
Complete the
“NTP-D146 Test E-Series Circuits” procedure on page 6-89
.
Step 25
To create additional circuits (spokes), repeat Steps
through
Stop. You have completed this procedure.
NTP-D144 Create an E-Series Single-Card EtherSwitch Manual
Cross-Connect
Note
In this procedure, cross-connect refers to a circuit connection created within the same node between the
Ethernet card and an STM-N card that is connected to third-party equipment. You create cross-connects
at the source and destination nodes so that an Ethernet circuit can be routed from source to destination
across third-party equipment.
Step 1
Complete the
“DLP-D60 Log into CTC” task on page 17-49
at an ONS 15454 SDH on the network
where you will create the circuit. If you are already logged in, continue with
.
Step 2
If you want to assign a name to the circuit source and destination ports before you create the circuit,
complete the
“DLP-D314 Assign a Name to a Port” task on page 20-7
. If you want CTC to assign a name
automatically based on circuit type, node name, and sequence number, continue with
Purpose
This procedure manually creates a single-card EtherSwitch cross-connect
between E-Series Ethernet cards and STM-N cards connected to non-ONS
equipment.
Tools/Equipment
E-Series Ethernet cards (E100T-G or E1000-2-G) must be installed at the
circuit source node.
Prerequisite Procedures
NTP-D127 Verify Network Turn-Up, page 6-5
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Summary of Contents for ONS 15454 SDH
Page 26: ...Tables vi Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 ...
Page 62: ...xxii Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...
Page 64: ...xxiv Cisco ONS 15454 SDH Procedure Guide R7 0 78 17194 01 About this Guide ...