
1-12
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 1 Install the Cisco ONS 15310-MA SDH
Required Tools and Equipment
Figure 1-5
EIA Jack Screw
Caution
Threading one jack screw completely before threading the other jack screw might result in connector
misalignment and damage to the EIA. Do not overtighten the jack screws.
Step 6
Install the remaining three 6-32 x 5/16-inch pan head screws onto the EIA and torque to 8 to 10 in-lbs.
Step 7
Repeat Steps
through
to install the other EIA, as necessary.
Step 8
Continue with the
“NTP-H151 Install the Power and Ground” procedure on page 1-12
.
Stop. You have completed this procedure.
NTP-H151 Install the Power and Ground
Note
A 1-inch (minimum) wide copper braid is required to ground the ONS 15310-MA SDH OSP cabinet and
is recommended for indoor installations.
115260
Thumbscrew
Inner screw
Rotation indicator
Purpose
This procedure describes how to install power feeds and how to ground the
ONS 15310-MA SDH.
Tools/Equipment
Ground cable, #6 AWG stranded copper conductors, minimum
90 degrees C (194 degrees F).
Copper power cable (from fuse and alarm panel to assembly).
#12 AWG stranded copper conductors, minimum 90 degrees C
(194 degrees F).
A 1-inch (minimum) wide copper braid.
Prerequisite Procedures
NTP-H150 Install the Shelf Assembly, page 1-5
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Summary of Contents for ONS 15310-MA SDH
Page 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Page 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Page 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...