
1-8
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 1 Install the Cisco ONS 15310-MA SDH
Required Tools and Equipment
Figure 1-2
Installing the Extended Cable Management Bracket
Step 4
If you plan to install electrical interface assemblies (EIAs), continue with the
Blank Sheet Metal Covers” procedure on page 1-9
to access the backplane. If not, continue with the
“NTP-H151 Install the Power and Ground” procedure on page 1-12
Stop. You have completed this procedure.
151578
Summary of Contents for ONS 15310-MA SDH
Page 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Page 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Page 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...