16-3
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 16 DLPs H1 to H99
Figure 16-1
Mounting Brackets (19-Inch Orientation)
shows the mounting bracket orientations for a 23-inch rack. The brackets are installed in the
same mounting holes.
Figure 16-2
Mounting Brackets (23-Inch Orientation)
Step 3
Lift the shelf assembly to the desired rack position and set it on the set screws.
124942
124943