Figure 6: Installing the left vertical air plenum
Step 4
Install the vertical air plenum to the right of the horizontal air plenum. Follow step 3a to 3c.
Figure 7: Installing the right vertical air plenum
Step 5
Install the 19-inch standard brackets on both sides of the chassis in the front position. See
the 19-inch Brackets on the NCS 2002 Shelf for ANSI Rack Configuration
.
Step 6
Install the NCS 2002 empty chassis below the horizontal plenum.
Installing the Air Flow Regulator
7
Installing the Air Flow Regulator
DLP-L65 Installing Air Plenum for NCS 2002 Shelf in ANSI 19-inch Configuration