![Cisco ME 1200 Series Hardware Installation Manual Download Page 18](http://html.mh-extra.com/html/cisco/me-1200-series/me-1200-series_hardware-installation-manual_66246018.webp)
2-4
Cisco ME 1200 Series Carrier Ethernet Access Devices Hardware Installation Guide
OL-31962-04
Chapter 2 Installing the Cisco ME 1200 NID
Installation the Switch
Verifying Switch Operation
Before installing the switch in a rack, on a wall, or on a table or shelf, you should power the switch and
verify that the switch passes POST.
•
To power on the AC switch, connect one end of the AC power cord to the AC power connector on the
switch, and connect the other end of the power cord to an AC power outlet.
•
Chapter 3, "Wiring the DC Input Power Source"
When the switch powers on, it automatically begins the POST, a series of tests that verifies that the switch
functions properly. When the switch begins POST. When POST completes successfully, the system LED
solid green.
Installation the Switch
•
•
Mounting the Switch on a Wall, page 2-7
•
Rack-Mounting
To install the switch in a 19-inch, 23-inch, or a European Telecommunications Standards Institute (ETSI)
rack, follow these instructions.
Attaching Brackets to the Switch
The bracket orientation and the brackets that you use depend on whether you are attaching the brackets for a
19-inch, 23-inch, ETSI rack, or Wall mount. Figure 2-1 shows the types of mounting brackets.