Connection Guidelines for AC-Powered Systems
Unpacking and Inspecting the Switch
Installing the Switch in a 4-Post Rack
Installing the Switch into a 2-Post Rack
Installing and Removing Components
Installing the ESD Grounding Strap
Installing and Removing Power Supply Units
Installing and Removing Fan Modules
Connecting the Cisco MDS 9124V-K9 Switch
C H A P T E R 5
Preparing for Network Connections
Connecting the Console Port to a PC
Connecting a Modem to a Console Port
Connecting the Management Ports
Connecting to a Fibre Channel Port
Removing and Installing Cables into SFP Transceivers
Installing a Cable into an SFP Transceiver
Removing a Cable from an SFP Transceiver
Removing and Installing SFP Transceivers
Maintaining SFP Transceivers and Fiber-Optic Cables
Cisco MDS 9124V-K9 Switch Hardware Installation Guide
iv
Contents