C H A P T E R
Preparing for Installation 2-1
Preparing for Installation
2
This chapter provides safety information and describes the tasks you must perform before
you install the LightStream 100 ATM switch.
This chapter contains the following sections:
•
Safety Recommendations
•
Installation Environmental Conditions
•
Confirming the Contents of the Shipping Container
•
LightStream 100 ATM Switch Components
Safety Recommendations
The following guidelines will help to ensure your general safety and protect the equipment:
•
Keep the chassis area clear and dust-free during and after installation.
•
Put the removed chassis cover in a safe place.
•
Keep tools away from walk areas where you and others could fall over them.
•
Do not wear loose clothing that could get caught in the chassis. Fasten your tie or scarf
and roll up your sleeves.
•
Wear safety glasses if you are working under any conditions that might be hazardous to
your eyes.
•
Do not perform any action that creates a potential hazard to people or makes the
equipment unsafe.