Dedicated Media

For installations where permanently installed building cable is available, 100-ohm UTP Category 3,
4, or 5 can be used. IBM Cabling System 150-ohm, STP cables (types 1 and 9) can also be used.
Because the RJ-45 connectors on the Catalyst 3920 use pins 3, 4, 5, and 6, a cable with an IBM STP
data connector on one end and an RJ-45 connector on the other must be constructed.

Shared Media

The types of cables that can be used are the same as those described above for dedicated-media
segments. The acceptable distances are defined by the hub or concentrator attached to the
Catalyst 3920 port.

Installation Summary

The basic installation steps are as follows:

Unpacking the Catalyst 3920

Gathering Other Materials You Will Need

Setting Up the Catalyst 3920

Cabling the Catalyst 3920

Cabling a Catalyst Stack Configuration

Powering On the Catalyst 3920

Unpacking the Catalyst 3920

To unpack the Catalyst 3920, follow these steps:

Step 1

Open the carton. Along with the Catalyst 3920 Token Ring Switch User Guide, the
package should contain:

Catalyst 3920

Power cord

Accessory kit (includes the manual, rack mounting brackets and screws, surface
mounting chassis feet, and electrostatic wrist strap)

If any item is missing or damaged, contact your Cisco Systems representative.

Step 2

Remove the power cord and bag containing the accessory kit.

Step 3

Remove the Catalyst 3920 from its protective packaging.

Step 4

Visually inspect the Catalyst 3920 to ensure that it was not damaged during shipment.

Summary of Contents for Catalyst 3920

Page 1: ...tain all connectivity and physical planning information about the network segments to which you will attach In addition if you are planning to use permanently installed telecommunications wiring you should have information about the cabling installation that will allow you to determine the termination points of every cable the cable type connector type if any and the distance between termination p...

Page 2: ... Summary The basic installation steps are as follows Unpacking the Catalyst 3920 Gathering Other Materials You Will Need Setting Up the Catalyst 3920 Cabling the Catalyst 3920 Cabling a Catalyst Stack Configuration Powering On the Catalyst 3920 Unpacking the Catalyst 3920 To unpack the Catalyst 3920 follow these steps Step 1 Open the carton Along with the Catalyst 3920 Token Ring Switch User Guide...

Page 3: ...ines are provided to ensure your safety The unit should be mounted at the bottom of the rack if it is the only unit in the rack When mounting the unit in a partially filled rack load the rack from the bottom to the top with the heaviest component in the bottom of the rack If the rack has stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Rack Mounting the...

Page 4: ... INS ACT INS ACT INS ACT INS ACT INS ACT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TX RX AT STACK PWR MODE RESET SYSREQ FAULT 10147 1 INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT INS ACT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 ...

Page 5: ...wall cables to connect devices to Token Ring ports on the Catalyst 3920 If you will use in the wall cables building wiring go to the Connecting Devices to the Token Ring Ports Using Building Wiring section Step 1 Using the Cabling Chart provided by your network administrator as a guide connect the cables between the Catalyst 3920 and the other devices Depending on the cable type you use the device...

Page 6: ... or that you disconnect the switches update them individually and then reconnect them to the stack Note Before you create a stack or add to a stack if any of the Catalyst 3920 units need software downloaded download the software before cabling the Catalyst 3920 units together Catalyst Stack Back to Back Connection Keep the following in mind when you install two Catalyst switches in a back to back ...

Page 7: ...hes and Catalyst Matrix in a rack or cabinet use the following instructions to cable the units together Step 1 Attach one end of the stack port cable to Port 1 recommended port to use first on the Catalyst Matrix Figure 3 6 It does not matter which end of the cable is used and it does not matter if the Catalyst switch or Catalyst Matrix is powered on or off Caution When installing the stack port c...

Page 8: ...tional is used on the phase conductors all current carrying conductors Warning This equipment is intended to be grounded Ensure that the host is connected to an earth ground during normal use Warning This unit might have more than one power cord To reduce the risk of electric shock disconnect the two power supply cords before servicing the unit To power on the Catalyst 3920 and to verify that it i...

Page 9: ...alyst stack units Step 1 Using the supplied power cables plug the female end of the cables into the AC receptacles on the Catalyst 3920 or each Catalyst Matrix module For the Catalyst 3920 the receptacle is on the left side of the back panel For the Catalyst Matrix it is at the lower right hand corner on the front panel of each module Step 2 Plug the male end of the power cords into a properly gro...

Page 10: ...Powering On the Catalyst 3920 Catalyst 3920 Token Ring Switch User Guide 3 10 ...

Reviews: