Contents
iv
Catalyst 2960-S Switch Hardware Installation Guide
OL-19732-04
2-4
2-4
2-5
2-5
2-5
Installing the FlexStack Module
2-7
2-8
Stack Bandwidth and Partitioning Examples
2-8
Power-On Sequence for Switch Stacks
2-10
2-10
2-10
Attaching the Rack-Mount Brackets
2-11
2-13
2-14
Attaching the Brackets for Wall-Mounting
2-14
Attaching the RPS Connector Cover
2-15
2-16
2-17
2-17
Connecting the FlexStack Cables
2-17
Installing the Power Cord Retainer (Optional)
2-18
Installing SFP and SFP+ Modules
2-20
Installing an SFP or SFP+ Module
2-21
Removing an SFP or SFP+ Module
2-21
Connecting to SFP and SFP+ Modules
2-22
Connecting to Fiber-Optic SFP and SFP+ Modules
2-22
2-23
10/100 and 10/100/1000 PoE+ Port Connections
2-24
10/100 and 10/100/1000 Port Connections
2-26
2-26
3-1
3-1
3-1
3-1
3-2
3-2
Ethernet and Fiber-Optic Cables
3-2