Figure 19: Attaching the mounting feet for Table-Mounting or Shelf-Mounting
Rubber mounting feet
1
Step 3
Place the switch on the table or shelf near an AC power source.
What to do next
When you complete the switch installation, see
After Switch Installation, on page 28
for information on
switch configuration.
After Switch Installation
• Configure the switch. For more information, see "Setting up the Switch" topic.
• Connect to the front-panel ports.
Connecting to the StackWise Ports
Before you begin
Before connecting the StackWise cables, read the "Planning a Switch Data Stack" section. Always use a
Cisco-approved StackWise cable to connect the switches.
Procedure
Step 1
Remove the dust covers from the StackWise cables and StackWise ports, and store them for future use.
Cisco Catalyst 9200 Series Switches Hardware Installation Guide
28
Installing the Switch
After Switch Installation
Summary of Contents for C9200L-24P-4G
Page 2: ... 2018 2020 Cisco Systems Inc All rights reserved ...
Page 94: ......