3-61
Cisco UCS C240 M4 Server Installation and Service Guide
OL-32474-01
Chapter 3 Maintaining the Server
Installing or Replacing Server Components
Note
If your server has two GPUs, skip the following step. The filler panel shunts airflow to the PCIe riser in
which a GPU is installed. A system with two GPUs does not use the filler.
Step 18
If your system has only a single K80 GPU, install the filler panel to the air baffle base in slot 2 as shown
in
. Slide the filler panel edges into the slots as shown.
Figure 3-31
Air Baffle Filler Panel and Bridge
Step 19
Install the bridge to the air baffle. Ridges on the bridge legs slide into slots on the air baffle base (see
Step 20
If the server has a SuperCap power module (RAID battery unit), install it to the holding clip on the new
air baffle (see
).
a.
Set the module into the clips and gently press down until the clip closes over the module.
b.
Route the module’s cable through the opening in the air baffle (see
) so that it does not
interfere with the server top cover.
1
Air baffle base
4
Holding clip for SuperCap module (RAID battery)
2
Filler panel
5
Path for SuperCap module cable through air baffle
opening (SuperCap module not shown)
3
Bridge
305093
2
1
3
4
5
Summary of Contents for c240
Page 8: ...Contents viii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 12: ...xii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 14: ...xiv Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 16: ...xvi Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 26: ...1 10 Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 Chapter 1 Overview ...