C H A P T E R
2-1
Catalyst 2975 Switch Hardware Installation Guide
OL-17784-01
2
Switch Installation
Read these topics and perform the procedures in this order:
•
Preparing, page 2-1
•
Planning a Switch Stack, page 2-6
•
Installing the Switch, page 2-9
•
Connecting to the Stack Ports, page 2-16
•
Installing SFP Modules, page 2-17
•
10/100/1000 PoE Port Connections, page 2-19
•
Where to Go Next, page 2-20
For initial switch setup, how to assign the switch IP address, and for powering information, see the
switch getting started guide on Cisco.com.
Preparing
•
Safety Warnings, page 2-1
•
Installation Guidelines, page 2-5
•
Box Contents, page 2-5
•
Tools and Equipment, page 2-5
Safety Warnings
This section includes the basic installation caution and warning statements. Read this section before you
start the installation procedure. Translations of the warning statements appear in the Regulatory
Compliance and Safety Information for the Catalyst 2975 Switch guide on the documentation CD and
online at Cisco.com.
Warning
To prevent the switch from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of 113•F (45•C). To prevent airflow restriction, allow at least
3 inches (7.6 cm) of clearance around the ventilation openings.
Statement 17B