Cisco MERAKI MS390 Series Installation Manual Download Page 1

MS390 Series Installation Guide

About this Guide

This guide provides instruction on how to install and configure your MS390 series switch. This guide also provides mounting instructions and limited
troubleshooting procedures. For more switch installation guides, refer to the

switch installation guides section

on our documentation website.

Product Overview

Models

Model number

Description

MS390-24-HW

Stackable Layer-3 24-port Gbe switch with 10G/40G modular uplinks, hot-swappable power
supplies and hot-swappable fans

MS390-24P-HW

Stackable Layer-3 24-port Gbe POE+ switch with 10G/40G modular uplinks, hot-swappable power
supplies and hot-swappable fans

MS390-24U-HW

Stackable Layer-3 24-port Gbe UPOE switch with 10G/40G modular uplinks, hot-swappable power
supplies and hot-swappable fans

MS390-24UX-HW

Stackable Layer-3 24-port mGbe UPOE switch with 10G/40G modular uplinks, hot-swappable
power supplies and hot-swappable fans

MS390-48-HW

Stackable Layer-3 48-port Gbe switch with 10G/40G modular uplinks, hot-swappable power
supplies and hot-swappable fans

MS390-48P-HW

Stackable Layer-3 48-port Gbe POE+ switch with 10G/40G modular uplinks, hot-swappable power
supplies and hot-swappable fans

MS390-48U-HW

Stackable Layer-3 48-port Gbe UPOE switch with 10G/40G modular uplinks, hot-swappable power
supplies and hot-swappable fans

MS390-48UX-HW

Stackable Layer-3 36-port 2.5Gbe and 12-port mGbe UPOE switch with 10G/40G modular uplinks,
hot-swappable power supplies and hot-swappable fans

1

Summary of Contents for MS390 Series

Page 1: ...ble fans MS390 24U HW Stackable Layer 3 24 port Gbe UPOE switch with 10G 40G modular uplinks hot swappable power supplies and hot swappable fans MS390 24UX HW Stackable Layer 3 24 port mGbe UPOE switc...

Page 2: ...90 Model Interfaces PoE UPoE Capabilities Power Load idle max Available PoE Hot Swap Power Supply MS390 24 HW 24 x 1GbE RJ45 n a 79 2 99 W Yes Dual MS390 24P HW 24 x 1GbE RJ45 PoE 84 1 554 4 W 445W Ye...

Page 3: ...the inital stage of boot up process Cycling through different colors Management plane is initializing and the switch initiates communication to Meraki cloud Solid white Switch is fully operational and...

Page 4: ...local status page 2 Stack Ports N A Stack Cables are connected here 3 Redundant Fans Green Active and operational 4 StackPower Ports N A StackPower cables are connected here 5 Power Supplies Green Act...

Page 5: ...0 24U Series front panel MS390 24UX Series front panel MS390 48 Series front panel MS390 48P Series front panel MS390 48U Series front panel MS390 48UX Series front panel MS390 48UX2 Series front pane...

Page 6: ...utton If the button is pressed and held for at least 10 to 15 seconds and then released the switch will reboot and be restored to its original factory settings by deleting all configuration informatio...

Page 7: ...e hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents Read the mounting instructions carefully before beginning installation Failure to use the...

Page 8: ...by default however the active VLANs can be changed via the local status page or dashboard When installing an MS390 it is important to ensure that any DHCP services or IP address assignments used for...

Page 9: ...t may take some time for a device to boot up so refer to the power LED indicators to understand what the switch is doing during boot up Be patient and let the switch complete the whole boot up process...

Page 10: ...2 Align the rack mount brackets on the sides of the switch onto the rack 10...

Page 11: ...3 Secure and screw in the rack mount bracket on to the rack 11...

Page 12: ...4 Insert the Uplink module 12...

Page 13: ...ble to the stack port on the switch back panel and finger tighten the screws clockwise direction Make sure the Cisco logo is on the top side of the connector Connect the other end of the cable to the...

Page 14: ...ard configuration but is automatically enabled when the cables are installed Basic Troubleshooting The following steps can be used for troubleshooting basic connectivity issues with your switch Factor...

Page 15: ...e operational documentation and or on the equipment labeling The equipment is not for domestic use The equipment is intended for operation without the constant presence of maintenance personnel The eq...

Page 16: ...ng in covered vehicles by any means of transport The temperature and humidity during transportation must comply with the permissible established ranges of temperature and humidity during storage in th...

Reviews: