5.9.- ETHERNET CABLE CONNECTION
Figure 25: Ethernet connection�
To get access to the Ethernet connector, follow these steps:
Before starting the procedure, be sure that the grid connection circuit
breaker is switched off�
Signal and ensure that there is no re-connection by accident�
1�-
Unplug the AC grid connector.
2�-
Ensure the PV switch is off.
3�-
Disconnect the battery.
4�-
Unplug the solar panel connectors. Wait 15 minutes until DC bus link is completely dis-
charged.
5�-
Unscrew completely the front cover screws, using a 3mm Allen key (ISO 2936) (
Figure 26
).
Figure 26: Unscrew completely the front cover screws�