Cinier Greenor Mounting Instruction Download Page 7

5 - Putting into service

Pressurize the hydronic circuit. 
Check that all connections are tight and leak free.
Purge  the  air  out  by  opening  the  manual  air  bleeder  valve;  insufficient  purging  may  result  in  an  inadequate 
heating performance.

Shut down the electrical circuit.
Check for potential electrical leakages 
Turn on the switch at the bottom left corner of the unit

Using the remote control, operate the fan coil unit to check that all the fans function properly at the 3 operating 
speeds. Check also that the opening of the thermal bypass valve opens correctly.

Once all these parameters have been configured and checked, turn off the unit.

6 - INSTALLING THE FRONT PANEL 

 Install the front panel holding it by the metallic frame and 
raising it slightly above the wall casing to hook the upper 
notch to the back of the wall casing.

Center the notch by looking at it from one side.

The  front  panel  can  then  be  fastened  to  the  two  bottom 
clamps.

Picture No 5

 - Electrical connection of the rough

Summary of Contents for Greenor

Page 1: ...ty does not cover any damage arising from improper installation improper maintenance improper storage or handling Remove the Greenor fan coil from its box and separate the front panel from the rough c...

Page 2: ...oil Use clean hands or clean thin rubber gloves to handle the panel Greenor fan coil must have at least a 6 15cm clearance on each side of the panel floor ceiling wall and at least 20 50cm in front of...

Page 3: ...e in reversible mode To use with a reversible heat pump on a closed water circuit with a maximal service pressure 101 5 PSI 7bars and a maximal water temperature of 167 F 75 C and minimal water temper...

Page 4: ...equate wall plugs and screws designed for the bearing wall The unit must be handled by two persons You may use an adapted lifting device Front View Rough Chassis Frontview Olycal Stone Frontplate 3 4...

Page 5: ...he gaskets and flexible hoses Connect the condensate line to the waste pipe use a condensate draining lifting pump when necessary Mounting of draining lifting pump Place the support of the pump using...

Page 6: ...Cable must not overhang from its protective ducting to prevent potential pinching by the front panel of the unit Make sure that power supply can be disconnected across all contacts Screw the cover bac...

Page 7: ...perate the fan coil unit to check that all the fans function properly at the 3 operating speeds Check also that the opening of the thermal bypass valve opens correctly Once all these parameters have b...

Page 8: ...regularly with a sweeper The panel can be cleaned with a slightly humid soft cloth or sponge with warm water and soap or a mild dish detergent Do not use abrasive or alkaline products Remove stains im...

Page 9: ...eport N 2300800CDG 001 controlled by INTERTEK Laboratory inc CSA C22 2 No 236 issue 2011 10 14 Ed 4 Heating and Cooling Equipment report N 2300800CDG 001 controlled by INTERTEK Laboratory inc CEM elec...

Reviews: