13
1. Place material pump in neutral (a)
2. Remove sealing tip and return wand to access port (b).
3. Pin wand trigger and set handle forward (c).
4. Close tank maintenance valve (d).
5. Connect air hose and open air cleanout valve (e).
6. Allow air to blow freely through sealing hose.
7. Move wand handle back and let air blow into tank (c).
8. Open Tank outlet valve momentarily, then close (d).
9. Shut air hose off at compressor, close air cleanout valve and dis-
connect hose (e).
10.
Turn Key off and proceed with normal machine shut-down.
(a)
(b)
(c)
(d)
(e)
Cleanout Procedure (Optional Air Cleanout)
Summary of Contents for Magma 150
Page 7: ...7 Controls and Their Functions 10 9 ...
Page 20: ...20 Parts Section ...
Page 21: ...21 Complete Wiring Diagram ...
Page 22: ...22 Wiring Diagrams Engine Harness ...
Page 23: ...23 Wiring Diagram Switch Plate ...
Page 24: ...24 Wiring Diagrams Temperature Control Panel ...
Page 25: ...25 Wiring Diagrams Relay Panel ...
Page 26: ...26 Wiring Diagrams Main Supply Harness ...
Page 27: ...27 Wiring Diagrams Burner ...
Page 28: ...28 Hydraulic Schematic For Compressor Hydraulics see Supplement manual ...
Page 33: ...33 Material Plumbing Components ...
Page 35: ...35 Material Pump Parts List For Reference Only We do not stock rebuild parts ...
Page 43: ...43 Miscellaneous Parts ...
Page 46: ...46 NOTES ...
Page 47: ...47 NOTES ...
Page 48: ...48 2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...