background image

Directions for 55x1

5.5

x12 Deluxe Commercial Frame

 

A

10’ lengths of 2” EMT (Lowes-72721 | Home Depot-5800

3

1)

9

B

3’ x 2’ Elbows

6

C

Eyebolt and Nut

9

D

10’ lengths of 1½” EMT (Lowes-72719 | Home Depot-613975)

4

E

Angle Support

4

F

2 ¼” Muffl er Clamps

4

G

Arch Ground Sleeves (2 1/4”)

6

H

Angle Support Ground Sleeves (1 1/2”)

4

I

Carabiners

42

J

Self-drilling screws

26

K

Drill Bit (for screws)

1

L

Lengths of Cable

3

M

Turnbuckles

6

N

U-Bolts

6

Please review the parts that you received to be sure that you have all the parts. 

If you have purchased the kit, you will have to go to the local hardware store and purchase the pipe 
(A & D). We have supplied you with the sku numbers for Home Depot and Lowes. If you purchased 
the complete frame, the poles will be delivered to you separately from the rest of your order.

You will need to purchase concrete to secure your arches into the ground.  We recommend one 
60lb. bag of Quikrete per Arch Ground Sleeve(G) and half of a bag for each Angle Support Ground 
Sleeve(H).

Plan on taking 2 days to complete the batting cage frame.

We recommend getting the Arch Ground Sleeves(G) set (Through step 10) on one day and then 
returning to fi nish the job the next day. This allows the concrete to fully set.

You will need about a 15½” x 56’ area for your new batting cage. It is recommended that you mark off 
this area before starting.

TAKE DOWN YOU

R

 CAGE IN THE WINTER. 

Snow will pile on top of the cage and that 

will bring down even the strongest batting cage

.

CMH-5542CCFAS225

1

 of 3

Reviews: