EN-3
Handling
●
When handling the unit, only use the lifting points
marked by the arrow labels. DO NOT USE ANY OTHER
POINT OF ATTACHMENT. Respect the instructions for
using slings which apply to each type of unit (see the labels
affixed to the sides). The weight of the unit is given on the
casing.
LIFTING ACCESSORIES FITTED ON THE UNIT MUST
NOT BE REMOVED TO HANDLE ANOTHER LOAD.
●
Handle the unit with care. Avoid any impacts or scratches
which may affect the unit's ability to operate correctly
(perforation of the elbows, damage to the finned surface,
twisting of piping, initial corrosion).
2 units: A = 2 m
3 or more units: A = 3 m
For information on the dimensions, weight, anchorage points and centre of gravity, refer to the drawings provided with the unit.
These drawings are provided for information only. Refer to the pictograms on the unit and in the documentation provided with it.
2 m
1.5 m
A
PREVAILING
WIND
PREVAILING
WIND
Maximum height = 2.2 m
1200V - 1800V
702V - 1100V
2300
702 V - 1100V
1200 V - 1500V
1650 V - 1800V
Centre of gravity