background image

CP2000-M/MR Ballast Replacement Instruction Sheet

1 of 5

020-100511-01 Rev. 1 (05-2010)

 

CP2000-M/MR Ballast Replacement

Instruction Sheet

INTRODUCTION

Use the following instructions when replacing the ballast in CP2000-M/MR (119-001101-xx/119-
002103-xx) projectors. The entire procedure takes approximately 20 minutes to complete.

SAFETY AND WARNING GUIDELINES

HIGH  VOLTAGES  MAY  BE  EXPOSED!  Always  power  down  and

disconnect power sources prior to servicing. Once the projector is powered down, allow
the cooling fans to automatically turn OFF before disconnecting from AC and opening
the projector. Depending on your projector model this can take 10-15 minutes.

QUALIFIED SERVICE TECHNICIANS REQUIRED! All module replacement

procedures must be performed by qualified service technicians.

 

NON-INSULATED DANGEROUS VOLTAGES MAY BE EXPOSED! Always

disconnect from AC prior to disassembly.

 

OBSERVE  ALL  ELECTROSTATIC  PRECAUTIONS!  Use  a  grounded  wrist

strap when handling electronic assemblies.

 

Never operate the projector (or the fans) without all the covers installed.

KIT REQUIRED

#003-120476-01 CP2000-M/MR Ballast Replacement Service Kit 

TOOLS REQUIRED

• Phillips

™ 

#1 (long stem), #2 

• 10mm wrench (to loosen ground nut)

Reviews: