background image

4

    

Figure 3

                                                                             

STEP 3

AB20069_G7

A

V

AA

F

P

G

                                                                             

STEP 4

Figure 4

AB20062_G8

K

I

H

J

R

Stationary Side Assembly to Short Foot Assembly:

Insert Dowel Pin (AA) into center hole of the top rail 

of Top Back Rail Assembly (G). Place Joint 

Connector Nuts (V) into holes in the back of Top 

Back Rail Assembly (G) and bottom of top and 

bottom rail of Stationary Side Assembly (A). Align 

Stationary Post Right (F) with Stationary Side 

Assembly (A).  Insert Allen Head Bolts (P) into 

Stationary Post Right (F) and Rotate Joint 

Connectors Nuts to align threads with bolts and 

snug with Allen wrench .

Tighten all Nuts and Bolts securely.

 

See figure 3. 

Assemble Base Front Rail Assembly to crib.

Assemble Decorative Base Cap Left (Y) and 

Decorative Base Cap Right (Z) to Base Front Rail 

Assembly (H) with Pan Head Screw (W). Small peg 

on back of each Decorative Base Cap fits into blank 

hole in front of Base Front Rail Assembly (H). 

Assemble slots on top of Base Front Rail Assembly 

(H) over tenon on bottom of Foot Posts (I) and (J). 

Insert Allen Head Bolt (R) through Cleat (K) and into 

Base Front Rail Assembly (H). 

Tighten all Nuts and Bolts securely.

See figure 4. 

Summary of Contents for Redmond F32801

Page 1: ...n Time Please have the model number and manufacture date available when you call or write us at Foundations 5216 Portside Dr Medina OH 44256 KEEP INSTRUCTIONS FOR FUTURE USE FOR CUSTOMER SERVICE CALL...

Page 2: ...48 11200070 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 16 8 14 8 16 22 18 6 2 PREPARATION Carefully remove and lay out all hardware and parts Check quantities and match the parts list Construct Crib on an even fla...

Page 3: ...tationary Post Right F and Foot Post Right J Figure 2 AB20072_G6 G V AA E P A Stationary Side Assembly to Short Head Assembly Place Joint Connector Nuts V into holes in the bottom of top rail Stationa...

Page 4: ...ationary Post Right F and Rotate Joint Connectors Nuts to align threads with bolts and snug with Allen wrench Tighten all Nuts and Bolts securely See figure 3 Assemble Base Front Rail Assembly to crib...

Page 5: ...er with Connector Nut U Insert Connector Nuts U and Allen Head bolts T into unused Holes Tighten all bolts securely with Allen Wrenches To Adjust height of Spring O remove Nuts and Bolts Then relocate...

Page 6: ...top of Foot Posts I and J Align Post Cap Left M onto Foot Post Left I and press onto Dowel Pins Insert Allen Head Bolt S through Post cap into Foot post and tighten Repeat above procedure with Post C...

Page 7: ...ailable for purchase to provide additional security Contact Foundations for assistance Refer to maintenance section for contact information WARNING WARNING WARNING WARNINGS For Toddler Bed Guard Rail...

Page 8: ...act a child s skin scouring pads steel wool or coarse rags This crib should be treated the same as any fine furniture STORAGE When storing crib use Caution as extreme temperature or humidity changes c...

Page 9: ...if any parts are loose or missing or if there are any signs of damage Do Not substitute parts Contact the manufacturer if replacement parts or additional instructions are needed Use a crib mattress t...

Page 10: ...uits de la plus haute qualit N anmoins malgr tous nos efforts il arrive parfois qu une pi ce manque ou qu une difficult se pr sente pendant l assemblage Si une pi ce est manquante ou bris e ou si vous...

Page 11: ...e demande Le chef de boulons Allen S et T ont un patch am lio rant la friction sur le fil qui peut entra ner une r sistance lors du serrage Ne pas remplacer les pi ces LISTE DES PI CES Description des...

Page 12: ...72_G6 G V AA E P A Construire pied court et l assemblage de t te Court Assembl e Chef Ins rez Allen Boulons t te S et T et noix de connecteur U dans les trous des pieds poteau gauche I et Stationnaire...

Page 13: ...avec c t fixe Assembl e A Ins rez Allen boulons t te P dans Stationnaire poteau droit F et Rotation commune Connecteurs noix pour aligner les discussions avec des boulons et serr avec une cl Allen Ser...

Page 14: ...ins rer Noix connecteur U et Allen Head vis T dans les trous inutilis s Serrer tous les boulons avec cl s Allen Pour r gler la hauteur du printemps O Retirer les crous et boulons Puis d m nager print...

Page 15: ...I et J Alignez Capuchon de poteau gauche M sur pied poteau gauche I et appuyez sur Goupilles Ins rez Allen Boulon T te S travers la PAC apr s en poste des pieds et serrer R p tez la proc dure avec Pos...

Page 16: ...Ces articles pourraient se coincer dans les pi ces du lit WARNING WARNING AVERTISSEMENTS pour lit d enfant MISE EN GARDE DANGER DE COINCEMENT DE LA T TE Pour viter qu il ne se cr e des espaces danger...

Page 17: ...RETIEN Lorsque le lit est compl tement assembl v rifiez que tous les boulons vis et raccords sont fermement serr s V rifiez r guli rement si le lit comporte des ferrures endommag es des joints desserr...

Page 18: ...ix e au cadre ressorts afin d y ranger les instructions d assemblage Placez ensuite les instructions d assemblage dans la pochette pour consultation future Nous recommandons l utilisateur de ne pas pl...

Page 19: ...e d tection d une pi ce desserr e de pi ce manquante ou de tout signe de dommages Ne pas substituer une pi ce une autre Communiquer avec le fabricant pour obtenir au besoin une pi ce de rechange ou de...

Reviews: