Safety Precaution

1

!

WARNING

·

  The  installation  shall  be  done  by  the  distributor  or  the  professional  staff.  The  installation  staff  must  have  related  professional  knowledge. 

Misoperation in the self-installation will result in fire, electric shock, injury, water leak, etc.

·

  If the air conditioner is installed in a small room, some proper measures shall be taken to make sure that the concentration of refrigerant leak in the 

room shall not exceed the critical level. For detailed measures, please consult the distributor.

·

  When connecting the power supply, comply with the regulations specified by the local power company. According to the law, the ground wire must 

be connected. The misconnection of the ground wire will result in electric shock.

·

  If the air conditioner needs to be moved or reinstalled, please inform the distributor or the professional staff to operate. Incorrect installation will 

result in fire, electric shock, injury, water leak, etc.

·

  The users are not permitted to rebuild or repair the air conditioner by their own. Incorrect repair will result in fire, electric shock, injury, water leak, 

etc.. Please inform the distributor or the professional staff to repair. 

·

  Make sure the water drainage ditch is useable.

·

  Make sure a current leakage protection switch is equipped. The current leakage protection switch must be equipped. If not, an electric shock will 

take place. 

·

  It mustn't be installed in any potential leakage location of inflammable gas. In case of the inflammable gas leak around the outdoor unit, a fire takes 

place. 

·

  Make sure the foundation and hoisting are firm and reliable. If not, it will result in a falling accident.

·

  Make sure all cables are correctly connected. The misconnection of the cables will result in the damage of electrical components.

·

  Pre-installation exposure to water or  other moistures will result in short  circuit of  its electrical components.. Don't  store it in any damp cellar or 

expose it to rain or water.

·

  In case of the refrigerant leaks during installation, the room must be ventilated at once. If the leaked refrigerant is exposed to flame, some toxic 

gases will be generated. 

·

  After installation, make sure the refrigerant is not leaked.

·

  If the refrigerant gas in the room is exposed to flame source, such as a heater, a stove or an electric cooker, some toxic gases will be generated..

·

  A lightning protection device must be equipped according to national laws and regulations against the lightning strike.

!

NOTE

2

 

Key Points for Construction Inspection

2.1  Arrival of goods and open-case inspection

1)

When  receiving  the  machine,  check  if  there  is  any  damage  in  transportation.  If  any  surface  or  internal  damage  is  found,  please  inform  the 

transportation agency in a written form.

2)

After receiving the machine, check if the type, specification and quantity of the machine conform to the contract.

3)

When unpacking the product, please keep the Manual well and check all accessories.

2.2 Refrigerant pipe

1)

The refrigerant pipe must be installed by the special refrigerant distributor made by our company (purchase). 

2)

The refrigerant pipe must use the pipe with specified diameter and wall thickness.

3)

The welding of the copper pipe must be performed with nitrogen-filled protection. Before welding, the copper pipe must be filled with the nitrogen of 

2

0.2kgf/cm . After welding, the nitrogen must be cut off until the copper pipe is thoroughly cooled down.

4)

The refrigerant pipe must be treated with thermal insulation.

5)

After the refrigerant pipe is installed and before the air tightness test and vacuumization are performed, the indoor unit cannot be power-on.

2.3 Air tightness test

2

After the refrigerant pipe is installed, nitrogen of 40kgf/cm  (4.0MPa) must be filled from the gas side and liquid side simultaneously for 24-hour air 

tightness test.

2.4 Vacuumizing

After the air tightness test, vacuumization (-0.1MPa) must be performed from both the gas side and the liquid side simultaneously.

2.5 Refilling of refrigerant

1)

The refilling volume of refrigerant is calculated by the diameter and length (actual length) of the pipe at the liquid sides of the indoor and outdoor 

units.

2)

The refilling volume of refrigerant, diameter and length (actual length) of liquid pipe, and height difference of the indoor and outdoor units shall be 

recorded into the use confirmation table of the outdoor unit (on the cover plate of electronic control box) for future reference.

2.6 Electrical wiring

1)

The  power  supply  capacity  and  wire  diameter  shall  be  selected  according  to  the  design  manual.  Generally,  the  power  line  of  the  air  conditioner  is 

thicker than that of the motor.

2)

To prevent misoperation of the air-conditioner, don't interlace or wind the power line (220-240V-/380V 3N-) with the connecting wires (low-voltage 

wires) of the indoor and outdoor units.

3)

The indoor unit is power-on after air tightness test and vacuumization.

2.7 Trial Run

1)

Trial run cannot be performed until the outdoor unit is power-on for more than 12 hours, or the system may be damaged.

* This air conditioner is a comfortable unit. Don't use it in some special places for machine rooms, precise instruments, 

foods, plants, animals, artworks, etc.

Summary of Contents for CMV-MINI

Page 1: ...ppearance of your air conditioner is different from that of the air conditioner in the Manual it will not affect its operation and use Please read this Manual before use carefully and keep this Manual...

Page 2: ......

Page 3: ...Table of Contents 1 Safety Precaution 1 2 Key Points for Construction Inspection 1 3 Installation of Outdoor Unit 2 4 Installation of Connecting Pipe 4 5 Electrical Wiring 10 6 Trial Run 14...

Page 4: ......

Page 5: ...ction Inspection 2 1 Arrival of goods and open case inspection 1 When receiving the machine check if there is any damage in transportation If any surface or internal damage is found please inform the...

Page 6: ...installation and maintenance 2 No barrier at the air inlet and the air outlet and away from strong wind 3 Dry and ventilated 4 The flat supporting surface is able to bear the weight of the outdoor uni...

Page 7: ...o be careful to hoist the machine 4 Don t hold the suction inlet of the housing or it will be deformed 3 5 Installation and maintenance space of outdoor unit 1 Provide a firm and adequate foundation t...

Page 8: ...nnecting pipe Threaded connection Gas side connecting pipe Liquid side connecting pipe Welding 4 Installation of Connecting Pipe 4 1 Refrigerant pipe 1 Flaring Use a pipe cutter to cut the refrigerant...

Page 9: ...efrigeration system When fastening the nut too strong force will damage the flared socket but too weak force will result in leakage Please refer to the tightening torque in the table above to fasten t...

Page 10: ...e diameter Pipe Capacity of Outdoor Unit kW Dimension of Main Pipe mm L 30m 1 L 30m 1 Liquid pipe 9 52 Liquid pipe 15 88 Liquid pipe 9 52 Liquid pipe 15 88 10 5 9 52 15 88 9 52 19 05 14 16 Table 4 3 D...

Page 11: ...7...

Page 12: ...refrigerant pipe is installed and connected to the indoor unit and before the connecting pipes between the indoor and outdoor units are connected to the valves of the outdoor units refill the nitrogen...

Page 13: ...t keep the vacuum pump on for 1 2h 4 6 Refilling volume of refrigerant The refilling volume of refrigerant R410A is calculated according to the diameter and length of the pipe at the liquid side of th...

Page 14: ...tem of the indoor unit shall be incorporated into the same system To reduce the interference the indoor and outdoor communication cables shall use two core or three core shielded twisted pair cables i...

Page 15: ...shielding net shall be connected to the ground Never connect the power line strong current to the terminal block of the signal line weak current Otherwise the power board will be burnt out 5 2 Wiring...

Page 16: ...play Control parameters only for use of development personnel Control parameters only for use of development personnel Spot check Content 1 2 3 4 5 6 7 8 9 10 No Spot check Content 12 13 14 15 16 17 1...

Page 17: ...utes 12 14 16and 18kW are effective 8 and 10kw have no such faults Display H6 for 3 times within 100 minutes 6 Trial Run 6 1 Inspection and confirmation before debugging 1 Check and make sure the refr...

Page 18: ...olume of refrigerant before delivery see the nameplate refilling volume of refrigerant corresponding to the length of pipe 3 B Calculate the indoor volume B m by the minimum volume Critical concentrat...

Page 19: ......

Page 20: ...ong CHIGO Heating Ventilation Equipment CO LTD Address Chigo Industrial District Nanhai Foshan Guangdong China P C 528244 Tel 86 757 8836905 Fax 86 757 88783793 4006 757 555 Hotline Web http www chigo...

Reviews: