![CHIEF XPA1U Installation Instructions Manual Download Page 11](http://html1.mh-extra.com/html/chief/xpa1u/xpa1u_installation-instructions-manual_2600347011.webp)
Installation Instructions
XPA1U
11
Cable Management
NOTE:
The following cable management options may vary
based on type of display being mounted and user
preference.
1.
Place FCA clip (P) into groove on back of Fusion mount with
clip handle in a vertical position. (See Figure 15)
2.
Rotate FCA clip (P) 90° in either direction until clip handle is
in a horizontal position. (See Figure 15)
3.
Repeat Steps 1-2 for all clips to be installed.
Figure 15
4.
Route cables along FCA clips (P) to be used for cable
management. (See Figure 16)
5.
Use cable ties (Q) to secure cables to FCA clips. (See
Figure 16)
Figure 16
6.
Route cables from display through inside of column
assembly attaching at cable management attachment
points and/or accessory bracket using cable ties (Q) or
cable clips (U) as desired. (See Figure 17)
IMPORTANT ! :
Route cables when display is at its
highest point and make sure enough slack exists so that
height may be adjusted without straining the cables!
7.
Route cables out through the slot on the back of the cart.
(See Figure 17)
Figure 17
8.
Use two 1/4-20 x 1/2” Phillips pan machine screws (W) to
attach two cable hooks (Y) to bottom of column assembly
(G). (See Figure 18)
9.
Wrap cables around cable hooks if desired.
Figure 18
2
3
3
clip handle
(P)
4
5
(Q)
6
6
7
6
(Q) or (U) at attachment
rear view
points
(Y) x 2
(W) x 2
8
(G)