Installation Instructions
WBAP
5
Installing to a Concrete, Concrete Block or Brick
Wall
1.
Determine the center of the whiteboard.
2.
Using a level, mark the wall above existing whiteboard
through four mounting slots in the WBAP bracket (A). (See
Figure 2)
Figure 2
3.
Drill one 5/16" x 2-1/2" pilot hole at each marking. (See
Figure 2)
4.
Install an anchor (C2) into each pilot hole using a hammer.
5.
Use four 1/4 x 2-1/2" lag bolts (C1) and four 1/4" flat
washers (C3) to attach WBAP bracket (A) to anchors in wall.
(See Figure 2)
6.
Attach projector to WBAP following instructions included
with projector.
Installing to a Steel Stud Wall
Site Requirements (See Figure 8)
WARNING:
IMPROPER INSTALLATION CAN LEAD TO
EQUIPMENT FALLING CAUSING SERIOUS PERSONAL
INJURY OR DAMAGE TO EQUIPMENT! The figure (See
Figure 8) identifies the minimum reguirements for installation
of a mount onto a steel stud structure. If the structure or its
components do not meet these requirements contact the
mount manufacturer for specific instructions before
attempting installation. It should also be noted that no other
equipment should be mounted to the same stud.
1.
Determine the center of the whiteboard.
2.
Locate the closest stud to the left and right of the selected
location.
3.
Using a level, mark the wall on each stud above existing
whiteboard through four mounting slots in the WBAP
bracket (A) mounting slots. (See Figure 3)
Figure 3
4.
Drill four 1/2" holes at markings. (See Figure 3)
5.
Hold metal channel on anchor (B3) flat alongside plastic
straps and slide channel through hole. (See Figure 4)
Figure 4
2
4
3
5
(C2) x 4
(C1) x 4
(C3) x 4
1/2" x 4
3
4
(B3) x 2
Drywall
Plastic Straps
5