Installation Instructions

LCD2TS

5

Assembly And Installation

For RPA Models Only

WARNING:

Failure to provide adequate structural strength

for this component can result in serious personal injury or
damage to equipment. It is the installer’s responsibility to
make sure the structure to which this component is attached
can support five times the combined weight of all equipment.
Reinforce the structure as required before installing the
component.

1.

Set the base plate (B) on a flat stable work surface and
adjust the feet as necessary.

2.

Thread the 1-1/2" pipe section (C) into the base plate and
tighten.

3.

Secure NPT pipe to base plate using one 5/16-18 x 3/8" set
screw (I).

4.

Attach RPA to projector arm (A) using four 1/4-20 X 1-1/2"
carriage bolts (H), four 1/4-20 acorn nuts (G) and 1/4" flat
washers (L). (See Figure 1)

Figure 1

5.

Slide both projector arms (A) onto the 1-1/2" vertical pipe
section (C) and secure using two 5/16-18 x 3/8" set screws
(I) on each arm. (See Figure 2)

6.

Thread 1-1/2" safety nut (F) onto threaded end of the 1-1/2"
pipe section. (See Figure 2)

7.

Mount projector hanging bracket to your projector (see RPA
instructions).

8.

Partially thread 10-24 thumbscrews onto 10-24 studs at top
of hanger bracket plate.  The quantity of thumbscrews may
vary from three to six.

9.

Align studs with key slots of RPA, slide RPA into place, and
secure RPA by tightening thumbscrews.

Figure 2

10. Adjust projector for correct registration.

For RPM Models Only

1.

Proceed with Steps 1-3 under

For RPA Models Only

.

2.

Place RPM on its top so that four screw holes are visible
through the square in the RPM base. (See Figure 3)

3.

Insert four 1/4"-20x1-1/2" (K) button head cap screws into
the bottom of the RPM. (See Figure 3)

NOTE:

The RPM base is not shown in Figure 3 for clarity only.
It should NOT be removed for this installation process.

Figure 3

4.

Place four nylon spacers (M) onto the screws as shown in
Figure 3.

5.

Tighten the screws through the nylon spacers and into the
two interface brackets (D).  (See Figure 3)

(H)x4

Adjustable
Feet

RPA

4

(G)x4

(L)x4

(C)

(A)

5

(I)x2

(C)

6

(F)

(K)x4

RPM base not
shown for
clarity only.

(D)

RPM

2

4 screw
holes

(M)x4

Summary of Contents for LCD2TS

Page 1: ...I N S T A L L A T I O N I N S T R U C T I O N S Multiple Projector Stacking System Table Stand LCD2TS ...

Page 2: ...ns CAUTION A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and inst...

Page 3: ...have de bocas Chiave a punte aperte Steeksleutel Clé à fourche By Hand A mano Von Hand Com a mão A mano Met de hand À la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perforar ...

Page 4: ...LCD2TS Installation Instructions 4 7 32 5 5mm 2 1 2 12 7mm TOOLS REQUIRED FOR INSTALLATION D 4 A 2 B 1 C 1 E 1 F 1 G 8 I 5 5 16 18X3 8 J 8 1 4 20X1 1 4 K 8 1 4 20X1 1 2 L 16 M 8 H 8 1 4 20 x 1 1 2 PARTS ...

Page 5: ...ee Figure 2 6 Thread 1 1 2 safety nut F onto threaded end of the 1 1 2 pipe section See Figure 2 7 Mount projector hanging bracket to your projector see RPA instructions 8 Partially thread 10 24 thumbscrews onto 10 24 studs at top of hanger bracket plate The quantity of thumbscrews may vary from three to six 9 Align studs with key slots of RPA slide RPA into place and secure RPA by tightening thum...

Page 6: ...e Figure 4 Figure 4 7 Place a 1 4 flat washer L onto each screw 8 Hold the RPM with interface brackets attached to the bottom of the projector arm and tighten the screws through the washers and into the interface brackets 9 Proceed with Steps 5 10 from For RPA Models Only section A L x4 RPM not shown for clarity only 8 J x4 ...

Page 7: ...Installation Instructions LCD2TS 7 ...

Page 8: ... 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 30I Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA Post Code 518112 P 86 755 8996 9226 8996 9236 8996 9220 F 86 755 8996 9217 8804 000053 RevA 2006 Chief Manufacturing www chiefmfg com 11 06 ...

Reviews: