background image

Model PNR™

Installation Instructions

8

Figure 8

Figure 9

ADJUSTMENTS

TENSION ADJUSTMENTS

Vertical Tilt Tension Adjustment

1.

With display mounted, check for desired vertical tilt
tension.

2.

Adjust the Centris Select

TM

 knob until desired vertical tilt

tension is obtained. (See figure 10)

Figure 10

3.

To lock the mount at the desired vertical tilt, tighten
the vertical tilt lock screw. (See figure 11)

Figure 11

Lateral Tilt Tension Adjustment

CAUTION:

Overtightening lateral adjustment will

cause excessive wear and may distort adjustment
components.

1.

Using a 9/16” wrench (not provided), slightly tighten or
loosen lateral tilt tension adjustment nut
(See figure 12).

2.

Mount the display and check for desired tilt tension.

3.

Repeat Steps 1 and 2 until desired tilt tension is
obtained.

Rotational Tilt Tension Adjustment

1.

If necessary, loosen or tighten bottom rotational tilt
tension adjustment nut (See figure 12).

2.

Mount the display and check for desired rotational tilt
tension.

3.

Repeat Steps 1 and 2 until desired rotational tilt
tension is obtained.

 Management Channel

Bottom Cable

 Management Channel

Centris Select

TM

Adjustment Knob

Vertical Tilt
Lock Screw

Summary of Contents for Large Flat Panel Dual Arm Wall Mount PNR

Page 1: ...the two top lag bolts into the dual wall studs the installer hangs the PNR on its top bracket and installs two lag bolts in the bottom bracket Next the installer makes the height adjustment mounts the...

Page 2: ...attached components or other equipment WARNING The weight of the display placed on the PNR must not exceed 200 lbs 90 72kg the maximum load capacity of the PNR WARNING Watch for pinch points Do not p...

Page 3: ...Installation Instructions Model PNR 3 DIMENSIONAL DRAWING...

Page 4: ...imension does not include the PSB interface bracket INTERFACES Table 2 lists the interface for the PNR TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools ma...

Page 5: ...e sure the mounting holes are level 6 With an assistant lay the PNR down on the floor 7 Drill two pilot holes using a 9 32 drill bit where the mounting holes were marked for anchoring the top bracket...

Page 6: ...ment nut counterclockwise CCW to raise the unit height Install Cover Plates and End Caps NOTE The cover plates and end caps have pressure fitting ends that lock in place with each other 1 Install cove...

Page 7: ...ngaged in mounting holes NOTE Holes are provided in the faceplate for use with a padlock or similar locking device if desired In addition the pin and nut may be removed from the upper holes and moved...

Page 8: ...nt will cause excessive wear and may distort adjustment components 1 Using a 9 16 wrench not provided slightly tighten or loosen lateral tilt tension adjustment nut See figure 12 2 Mount the display a...

Page 9: ...ring the Swing Arms Right of Center With some disassembly and reassembly you can move the swing arms to the right of center by reconfiguring the mount Use the third and fifth slotted holes in the top...

Page 10: ...djustment bar and wrench provided with the mount 2 Place adjustment bar into socket head cap screw located at swing arm pivot point See figure 16 NOTE The display may need to be repositioned in order...

Page 11: ...and press pin down into Open position See Figure 19 WARNING DISPLAY MAY WEIGH IN EXCESS OF 40 LBS Always use two people and proper lifting techniques when installing or positioning display on mount 3...

Page 12: ...Model PNR Installation Instructions 12...

Reviews: