Installation Instructions
FMSWM / FMSWA
7
Installing to Wood Stud Walls
1.
Drill one 7/32" (5.5mm) pilot hole in stud at upper mounting
slot. (See Figure 7)
2.
Partially install one 5/16 x 2-3/4" flanged lag bolt (E) into
pilot hole but do not tighten to wall.
3.
Hang outside wall upright (A) [or center wall upright (B)]
aligning upper mounting slot over lag bolt and level upright.
4.
Place one slotted washer (G) over flanged lag bolt. (See
Figure 7)
5.
Tighten lag bolt to secure wall upright (A or B) to wall at
upper mounting slot. (See Figure 7)
Figure 7
6.
Mark the attachment point for the lower mounting slot,
making sure the attachment point is located on the stud.
(See Figure 7)
7.
Drill 7/32" (5.5mm) pilot hole at marking for lower mounting
hole. (See Figure 7)
8.
Use one 5/16 x 2-3/4" flanged lag bolt (E) and one 5/16"
slotted washer (G) to attach each wall upright to the wall
through the lower mounting hole. (See Figure 7)
9.
Repeat Steps 1 through 8 for remaining wall upright(s).
10. Adjust depth of wall uprights, if necessary, so that the face
of the wall uprights are all in the same plane across the
width of wall upright installation: (See Figure 7)
•
Loosen button head screws (4 places)
•
Adjust depth along depth-adjust slots.
•
Tighten button head screws.
IMPORTANT ! :
Be sure to securely tighten depth-adjust
screws after adjustment.
11. Proceed to
Mounting Rails
section.
Installing to Concrete Walls
1.
Drill one 3/8" x 3-1/2" (9.5mm x 88.9mm) pilot hole at each
marking. (See Figure 8)
2.
Install one anchor (F) into each pilot hole using a hammer,
making sure that the anchor is flush with the wall.
3.
Partially install one 5/16 x 2-3/4" flanged lag bolt (E) into
pilot hole but do not tighten to wall.
4.
Hang outside wall upright (A) [or center wall upright (B)]
aligning upper mounting slot over lag bolt and level upright.
5.
Place one slotted washer (G) over each flanged lag bolt.
(See Figure 8)
6.
Tighten lag bolt to secure wall upright (A or B) to wall at
upper mounting slot.
Figure 8
7.
Mark the attachment point for the lower mounting slot. (See
Figure 8)
8.
Drill 3/8" x 3-1/2" (9.5mm x 88.9mm) pilot holes at marking
for lower mounting hole. (See Figure 8)
9.
Install an anchor (F) into each pilot hole using a hammer,
making sure that the anchor is flush with the wall.
10. Use one 5/16 x 2-3/4" flanged lag bolt (E) and one 5/16"
slotted washer (G) to attach the wall upright to the wall
through the lower mounting hole. (See Figure 8)
11. Repeat Steps 1 through 10 for remaining wall upright(s).
12. Adjust depth of wall uprights, if necessary, so that the face
of the wall uprights are all in the same plane across the
width of wall upright installation: (See Figure 7)
•
Loosen button head screws (4 places)
•
Adjust depth along depth-adjust slots.
•
Tighten button head screws.
IMPORTANT ! :
Be sure to securely tighten depth-adjust
screws after adjustment.
13. Proceed to
Mounting Rails
section.
(G)
4
(E) x 2
5
(A)
8
8
1
7
6
Depth-adjust
screws x 4
11
2
(F) x 2
1
8
9
(E) x 2
6
10
(A)
7
(G)
Depth-adjust
screws x 4
13