background image

I N S T A L L A T I O N   I N S T R U C T I O N S

Ceiling Plate

Spanish Product Description
German Product Description

 Portuguese Product Description

 Italian Product Description

Dutch Product Description

French Product Description

CMA101

Summary of Contents for CMA101

Page 1: ...I O N I N S T R U C T I O N S Ceiling Plate Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product D...

Page 2: ...rious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equip...

Page 3: ...concrete 5 16 x 3 1 2 minimum length Grade 2 lag bolts Qty 4 Fischer UX10 concrete anchors OR Toggler AF8 concrete anchors Qty 4 3 Install to Unistrut 5 16 18 threaded rod Qty 4 5 16 Grade 2 nuts Qty...

Page 4: ...l Chave de bocas Chiave a punte aperte Steeksleutel Cl fourche By Hand A mano Von Hand Com a m o A mano Met de hand la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschl ssel Chave de cabe a...

Page 5: ...ion 1 Carefully determine required mounting location IMPORTANT This will require knowing the lens to screen distance See projector specifications for details on determining this distance WARNING IMPRO...

Page 6: ...de mark four mounting hole locations on ceiling See Figure 3 3 Drill four 3 1 4 deep pilot holes See Figure 3 For Fischer UX10 anchors use a 3 8 drill bit For Toggler AF8 anchors use a 5 16 drill bit...

Page 7: ...uded onto each threaded rod 3 Install CMA101 onto threaded rods inserting the rods into the four holes on top of the CMA101 4 Secure the threaded rods to the CMA101 with one 5 16 nut not included and...

Page 8: ...918 Europe A Franklinstraat 14 6003 DK Weert Netherlands P 31 0 495 580 852 F 31 0 495 580 845 Asia Pacific A Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong P 852 214...

Reviews: