RECEIVER TUBE (#1, #2, #3, #4, #5, #6, #10, #11)
REMOVER/INSTALLER
(#13)
PLUG BOLT (#14)
FORCING SCREW
C-FRAME
FIGURE B
4.
Mount the proper size Receiver Tube (parts #1, #2, #3, #4, #5, #6, #10, #11) over
the threaded side of the ball joint.
(See Figure B, and Assy. Diagram.)
5.
Align the mounted Remover/Installer (part #13), ball joint, and Reciever Tube
(parts #1, #2, #3, #4, #5, #6, #10, #11) to allow removal of the ball joint.
6.
Using a wrench, turn the Forcing Screw assembly clockwise to remove the ball
joint.
To Install A Ball Joint:
1.
Mount the Remover/Installer (part #13) on the Forcing Screw assembly so that
the
larger
diameter portion of the Remover/Installer faces the
threaded
hole of
the C-Frame, and the
smaller
diameter portion faces the
unthreaded
side of the
ball joint.
(See Figure B, and Assy. Diagram.)
2.
Place the mounted Remover/Installer (part #13) on the
unthreaded
side of the
ball joint.
(See Figure B, and Assy. Diagram.)
3.
Align the mounted Remover/Installer (part #13), ball joint, and proper size
Reciever Tube (parts #1, #2, #3, #4, #5, #6, #10, #11) to allow installation of the
ball joint.
(See Figure B, and Assy. Diagram.)
4.
Using a wrench, turn the Forcing Screw assembly clockwise to install the ball
joint.
(See Figure B, and Assy. Diagram.)
SKU 46389
PAGE 6