![Chelino ChelinoBaby TIFFANY 2 IN 1 Instruction Manual Download Page 4](http://html1.mh-extra.com/html/chelino/chelinobaby-tiffany-2-in-1/chelinobaby-tiffany-2-in-1_instruction-manual_2595766004.webp)
2. INSTALLING THE BASSINET:
4. DAYBED INSTRUCTION:
Part List
A
B
C
A
A
B
B
C
A
A
B
B
1. Zip the basinet on and cover the zipper with the zipper cover to avoid
baby from getting injured.
3. CHANGING TABLE INSTRUCTION:
1.Connect the 2 short end bars together.
2.Attach the diaper changing table by hooking the plastic hooks on the long
side rails. Make sure all the hooks are securely engaged with the rails.
6
7
2.Thread the tubes into the pockets on the basinet. There are 2pockets
on either end of the basinet.
3.Connect the tubes together by inserting them into one another.
4.There are 2 sets of tubes that need to be parallel to each other.
5.Once the basinet is zipped on, the tubes are inserted and the basinet is
firm. than place the mattress on top of the poles.
1.Place the daybed inside of the bassinet with the head support at
either as shown.
2.Insert the tube into the channel on the inside of the bassinet as
shown. Pull open channel for insertion.
3.Insert metal tube into plastic tube. Make sure the button clicks into
place as shown.
4.Insert opposite metal tube into plastic tube. Make sure the button
clicks into place as shown.
a) b)
c) d) e