Page 9
Chapter 2
Configuring Power-1
The workflow for configuring Power-1 is:
1. Mount the Power-1 in the rack.
2. Connect the cables and power on.
3. Perform the initial configuration.
4. Add the Power-1 object in SmartDashboard and install a policy.
Note
- Security Management Server is not installed locally on Power-
1. In a production environment, Power-1 appliances should be
centrally managed.
In This Chapter
Mounting Power-1 in a Rack
10
Connecting the Power Cables and Power On
10
Using the First Time Configuration Wizard
11
Creating the Power-1 Object in SmartDashboard
13
Advanced Configuration
13