EN
2
RB-X200CM QRG Rev. 1
QUICK REFERENCE GUIDE
Mounting
Before mounting this product, read the
, as well as those for the attached products.
Mounting Diagram
Eye Bolt Installation
1.
Remove cotter-pin from set-pin by pressing the safety button in the middle of the handle.
2.
Remove set-pin from eye bolt.
3.
Align the eye bolt over one of the pre-cut holes on the rig bar.
4.
Insert the set-pin to secure the eye bolt to the rig bar
5.
Re-insert the cotter-pin bac into the set-pin
Mounting Procedure
1.
Insert alignment hanger into the alignment hole and push panel forward.
2.
Push both male Speego into female Speego connections and turn clockwise to tighten panel to the rig bar.
3.
Reverse the steps above to remove panel from rig bar. Push tab on female Speego connection to release male
Speego.
Technical Specifications
Dimensions and Weight
Note
: Dimensions in inches are rounded.
Ordering
The alignment hanger on the PVP X6IP is designed to temporarily hold the weight of the panel to
allow the user to properly align and tighten the panel into place
Length
Width
Height
Weight
82.20 in (2088 mm)
5.12 in (130 mm)
6.46 in (164 mm)
40
lb (18.1 kg)
Load Capacity
Recommended Shackle
920 lb (417 kg)
5/8”
Product Name
Item Name
Item Code
UPC Number
RB-X200CM
RBX200CM
23111033
781462213824
!