
EN
4
Ground Support 2 Kit QRG Rev. 1
QUICK REFERENCE GUIDE
Mounting
Before mounting this product, read the
, as well as those for the attached products.
Mounting Diagram
Mounting Procedure
1.
Insert TR16 Screw Jack into the bottom of the dual function F-series rig bar panel.
2.
Align the floor base panel with the female speego connection on the rig bar.
3.
Use the tightening nut to adjust the height of the rig bar and floor base panel. Verify they are level with the
surface.
4.
Turn the locking nut on the screw jacks to secure the position.
Dual-function F-series
Rig Bar
Floor Base
TR16 Screw Jacks
Male Speego
connection
Dual-function F-series
Rig Bar
Female Speego
connection
Locking Nut
Tightening Nut