www.charltonandjenrick.co.uk
27
LT8019
Optional flue lengths
Addition Flue Length
Part Number
500mm Flue Length
8107
1000mm Flue Length
8108
Support Brackets
8117
SECTION ELEVEN connecting the gas supply (Installation Instructions)
GAS SUPPLY ROUTING :-
Use rigid or semi
–
rigid tube to connect the supply. Determine the gas supply pipe route to the appliance before
installing the Stove.
Check the gas run to assess that the gas supply is capable of providing the required amount of gas and is in
accordance with the rules in force.
Soft copper pipe can be used to install the appliance. Soldered joints can be used only externally of the appliance.
The appliance is supplied with a factory fitted isolation device to allow for an 8mm copper connection. No further
isolation point is required.
The new gas line must be purged of any debris, prior to final connection to the appliance.
Gas inlet isolation device is located on bottom right hand side of the fire box, the gas supply entry point is positioned
at the rear bottom on right hand side. The gas inlet isolation device must be angled to allow access to the grub screw
and gas test nipple.
POWER LEAD ROUTING
The power supply for this appliance is provided via AC power adaptor 230 VAC. The main cable terminates the rear
Right hand side of the fire box. The length of the cable provided with the appliance is 1.65 metres. Care must be
taken when siting the fire box not to trap the exposed main cable within the builders opening.
Note: the power cable link to the transformer must be accessible for repairing handset and use with the battery
holder
The cable can be routed using the following two methods,
Method 1
Passing the cable through the side of the chimney breast. It is good practice to run the cable within a sleeve of at
least 15mm internal diameter, sealing the sleeve using a suitable sealant at the point the sleeve / cable terminates
the chimney masonry.
Method 2
Remove a channel out of the outer skin of the Dry / wet plaster of the chimney breast up to the main power point.
Again it is good practice to run the cable within a sleeve of at least 15mm internal diameter.
With power points that exceed the 1.65 metre distance, an optional 2.0 metre extension cable is available Part No
7147.
Summary of Contents for Edge 3s BF
Page 15: ...www charltonandjenrick co uk 15 LT8019 Appliance Dimensions EDGE BF EDGE 3s BF ...
Page 21: ...www charltonandjenrick co uk 21 LT8019 ...
Page 22: ...22 LT8019 ...
Page 32: ...32 LT8019 SECTION FOURTEEN Wiring Diagram Maintenance Instructions ...
Page 34: ...34 LT8019 Register your appliance online today to active your warranty ...
Page 37: ...www charltonandjenrick co uk 37 LT8019 ...
Page 38: ...38 LT8019 ...