RT115 Tier 3- DRILLING ATTACHMENT
PREPARE JOBSITE AND EQUIPMENT
144
RT115 Tier 3 - DRILLING ATTACHMENT
PREPARE JOBSITE AND EQUIPMENT
Drill Pipe and Equipment
1.
Assemble at least 20’ (6 m), but not more than 30’ (9 m), of
drill rod.
2.
Install drill bit to the cutting end of the drill string.
3.
Put drill string in approach trench.
4.
Move tractor to the approach trench and align the drilling
attachment with the intended bore path.
5.
Turn off engine.
6.
Attach drill string to drilling attachment.
NOTICE: More than 10-15’ (3-4.5 m) of drill rod out of
the trench increases the tendency of drill rod to bend.
om0540h.eps
Drill Pipe and Equipment
1.
Assemble at least 20’ (6 m), but not more than 30’ (9 m), of
drill rod.
2.
Install drill bit to the cutting end of the drill string.
3.
Put drill string in approach trench.
4.
Move tractor to the approach trench and align the drilling
attachment with the intended bore path.
5.
Turn off engine.
6.
Attach drill string to drilling attachment.
NOTICE: More than 10-15’ (3-4.5 m) of drill rod out of
the trench increases the tendency of drill rod to bend.
om0540h.eps
Summary of Contents for RT115 Tier 3
Page 10: ...RT115 Tier 3 CONTENTS 1...
Page 44: ...RT115 Tier 3 CONTROLS OVERHEAD CONSOLE DESCRIPTIONS 4...
Page 60: ...RT115 Tier 3 SAFETY SAFETY ALERTS 6...
Page 94: ...RT115 Tier 3 TRENCHER ATTACHMENT OPTIONAL EQUIPMENT 9...
Page 114: ...RT115 Tier 3 REEL WINDER ATTACHMENT OPERATION 1...
Page 128: ...RT115 Tier 3 SAW ATTACHMENT OPTIONAL EQUIPMENT 1...
Page 140: ...RT115 Tier 3 BACKHOE ATTACHMENT 1...
Page 244: ...RT115 Tier 3 SPECIFICATIONS RC115 REEL CARRIER 2...
Page 247: ...RT115 Tier 3 WARRANTY 247...
Page 248: ...RT115 Tier 3 WARRANTY 2...
Page 249: ...RT115 Tier 3 249...
Page 250: ...RT115 Tier 3 2...
Page 251: ......
Page 252: ......